call-header call Today : 626-685-9560
search icon cross icon
  • user icon Client Login
  • Request a quote

Property Condition Assessments: The Name That Has Set The Standard For over 27 Years.

  • About
    • Company Profile
    • Our Team
    • FAQ
  • Services
    • Property Condition Assessments
    • Construction Consulting
    • Environmental Consulting
    • Energy Consulting
    • Government & Institutional
    • Specialty Consulting
  • Representative Projects
  • News & Events
  • Resources
  • Careers
  • Contact US

Our Projects

banner angle long down arrow

Eldridge Place

location1

Location

737, 757, and 777 North Eldridge Parkway, Houston, TX
location2

Total Buildings

3

Total Sqft:

824,632

Property Details:

  • Building Type: High-Rise Office
  • Building Address: 737, 757, 777 N. Eldridge Parkway
  • Building Area: 824,632 sf
  • Number of Buildings: 3
  • Land Area: 10.22 acres
  • Stories: 13, 14 & 12
  • Year Built: 1984; 1986; 2009
  • Number of Elevators: 25

Services Completed:

  • Architectural Assessment
  • Mechanical/Electrical/Plumbing/Limited Fire- & Life-Safety Assessment
  • Roofing Assessment
  • Curtain Wall Assessment
  • Structural Assessment
  • Vertical Transportation Assessment
  • Public Records Review

About This Project

PCA conducted a Property Condition Assessment of Eldridge Place, a three-building high-rise office complex located at 737, 757, and 777 N. Eldridge Parkway in Houston, Texas. The property comprises buildings of 13, 14, and 12 stories totaling approximately 824,632 square feet on a 10.22-acre site, with construction dates of 1984, 1986, and 2009. The complex includes 25 elevators across the three towers.

The engagement included architectural, structural, roofing, curtain wall, and mechanical/electrical/plumbing/limited fire- and life-safety evaluations, along with a vertical transportation assessment and a public records review. PCA’s curtain wall assessment informed envelope-replacement timing and immediate repair priorities across the three towers, and the vertical transportation assessment produced a reserve estimate for elevator replacement timing across the 25-unit population. Roofing observations established repair-versus-replacement timing for near-term capital planning, and the public records review supplemented field findings with documentation context. PCA quantified deferred maintenance and remaining-useful-life projections under ASTM E2018 protocols, giving the client a defensible basis for prioritizing repairs and sizing reserves across a portfolio of buildings spanning a 25-year construction range.

View Related Projects

Jamie Lane Residential Portfolio

East Palo Alto, CA

Euclid, Circle and Woodland Portfolio

East Palo Alto, CA

Georgia Medical Office Building Portfolio

Multiple — Lawrenceville and Newnan, GA

Harper Portfolio

Multiple — Avon, Hamlin, Lima, Rochester, NY

Palo Alto Residential Portfolio

East Palo Alto, CA

Project Vault Portfolio

Multiple — NC, AZ, VA, IN, TX, MO, CA
#
Follow Us:

PCA

  • About
  • Services
  • Representative Projects
  • News & Events
  • Resources

Careers

  • Work at PCA
  • Life at PCA
  • Open Positions

Contact Us

  • Request A Quote
  • Client login
  • dphillips@pcallc.com
  • (626) 685 - 9560

Copyright Property Condition Assessments LLC 2026

Call Request a Quote