Property Condition Assessments: The Name That Has Set The Standard For over 27 Years.

The Aspens at Bedford Falls

location1

Location

1580 DunnRoad, Raleigh, NC
location2

Total Buildings

4

Total Sqft:

160,924

Property Details:

  • Building Type: Independent Living Facility
  • Building Address: 1580 Dunn Road
  • Building Area: 160,924 sf
  • Number of Units: 182
  • Number of Buildings: 4
  • Land Area: 9.79 acres
  • Stories: 4
  • Year Built: 2019

Services Completed:

  • Architectural Assessment
  • Lab Results One Day Turnaround
  • Mech/Elect/Plumb/Limited Fire-Life Safety Assessment
  • Roofing Assessment
  • Structural Assessment
  • Limited Radon Screening
  • Radon Screen
  • Radon Assessment
  • Marshal & Swift Report
  • Phase I Environmental Site Assessment
  • Vertical Transportation Assessment

About This Project

PCA conducted due-diligence services at The Aspens at Bedford Falls, an independent living facility located at 1580 Dunn Road in Raleigh, North Carolina. Completed in 2019, the property comprises four buildings totaling approximately 160,924 square feet and 182 units across four stories on a 9.79-acre site. PCA’s scope addressed the major building systems, envelope components, and environmental conditions relevant to the engagement.

The engagement included architectural, structural, roofing, and mechanical/electrical/plumbing/limited fire-life-safety evaluations under ASTM E2018 protocols, along with a vertical transportation assessment, radon screening and assessment with one-day lab turnaround, a Marshall & Swift replacement-cost report, and a Phase I Environmental Site Assessment under ASTM E1527. PCA quantified deferred maintenance and remaining-useful-life projections for the client’s reserve and capital planning, produced a reserve estimate for elevator replacement timing, and screened for recognized environmental conditions to inform the client’s environmental risk position. Radon screening provided sub-slab air-quality data relevant to a senior living use. The consolidated findings gave the client a defensible basis for prioritizing immediate repairs and sizing reserves across the four-building campus.