Property Condition Assessments: The Name That Has Set The Standard For over 27 Years.

park creek independent living exterior

Park Creek Independent Living

location1

Location

16718 Huffmeister Road, Cypress, TX
location2

Total Buildings

1

Total Sqft:

146,581

Property Details:

  • Building Type: Assisted Living
  • Building Address: 16718 Huffmeister Road
  • Building Area: 146, 581 sf
  • Building Units: 126
  • Number of Buildings: 1
  • Land Area: 7.15 acres
  • Stories: 4
  • Year Built: 2017

Services Completed:

  • Architectural Assessment
  • Electrical Review
  • Electrical Systems Assessment
  • Field Leak Testing at Floor 4 Window
  • Field Quality Control – Field-Leak Testing
  • Fire and Life Safety Review
  • Fire and Life Safety Systems Assessment
  • Mechanical and Plumbing Review
  • Mechanical and Plumbing Systems Assessment
  • Phase I – Initial Site Visit Review
  • Phase I – Peer Review of Drawing and Specifications
  • Phase II – PCA and Final Construction Review
  • Public Records Review
  • Roofing Assessment
  • Structural Assessment
  • Vertical Transportation Assessment & Review

About This Project

PCA conducted a property condition assessment of Park Creek Independent Living at 16718 Huffmeister Road in Cypress, Texas — a 126-unit assisted living property completed in 2017. The four-story building totals approximately 146,581 square feet on a 7.15-acre site. PCA’s scope addressed the major building systems, envelope components, and construction documentation relevant to the engagement.

The engagement included architectural, structural, roofing, mechanical/plumbing, electrical, and fire-and-life-safety assessments, along with a vertical transportation assessment, a public records review, and field leak testing at a fourth-floor window. PCA’s work was structured in two phases — an initial site visit and peer review of drawings and specifications, followed by a property condition assessment and final construction review. The vertical transportation assessment produced a reserve estimate for elevator replacement timing, while the field leak testing supported envelope quality control at the tested location. PCA documented observed conditions across the property and quantified deferred maintenance and remaining-useful-life projections for the client’s reserve and capital planning. The consolidated findings gave the client a defensible basis for prioritizing repairs and sizing reserves for the property’s principal systems.

View Related Projects