call-header call Today : 626-685-9560
search icon cross icon
  • user icon Client Login
  • Request a quote

Property Condition Assessments: The Name That Has Set The Standard For over 27 Years.

  • About
    • Company Profile
    • Our Team
    • FAQ
  • Services
    • Property Condition Assessments
    • Construction Consulting
    • Environmental Consulting
    • Energy Consulting
    • Government & Institutional
    • Specialty Consulting
  • Representative Projects
  • News & Events
  • Resources
  • Careers
  • Contact US

Our Projects

banner angle long down arrow

Clackamas MOB

location1

Location

9280 SE SunnyBrook Boulevard, Clackamas, OR
location2

Total Buildings

1

Total Sqft:

19,916

Property Details:

  • Building Type: Medical Office Building
  • Building Area: 19,916 sf
  • Building Address: 9280 SE Sunnybrook Boulevard
  • Stories: 3
  • Year Built: 2009
  • Number of Parking Spaces: 61, open surface and garage
  • Number of Buildings: 1
  • Land Area: 0.19 acres

Services Completed:

  • Architectural Assessment
  • Mech/Elect/Plumb/Limited Fire-Life Safety Assessment
  • Roofing Assessment
  • Structural Assessment
  • Vertical Transportation Assessment

About This Project

PCA conducted a Property Condition Assessment of the Clackamas MOB at 9280 SE Sunnybrook Boulevard in Clackamas, Oregon. The three-story medical office building was completed in 2009 and totals approximately 19,916 square feet on a 0.19-acre site, with 61 parking spaces across open surface and garage configurations. PCA’s scope addressed the principal building systems and envelope components relevant to the engagement.

The team performed architectural, structural, roofing, mechanical/electrical/plumbing/limited fire-life safety, and vertical transportation evaluations under ASTM E2018 protocols. PCA documented observed conditions, quantified deferred maintenance, and developed remaining-useful-life projections to support the client’s reserve and capital planning. The vertical transportation assessment produced a reserve estimate for elevator replacement timing, while the roofing assessment established repair-versus-replacement timing for near-term capital planning. The consolidated findings gave the client a defensible basis for prioritizing immediate repairs and sizing reserves for the property’s principal systems.

View Related Projects

Jamie Lane Residential Portfolio

East Palo Alto, CA

Euclid, Circle and Woodland Portfolio

East Palo Alto, CA

Georgia Medical Office Building Portfolio

Multiple — Lawrenceville and Newnan, GA

Harper Portfolio

Multiple — Avon, Hamlin, Lima, Rochester, NY

Palo Alto Residential Portfolio

East Palo Alto, CA

Project Vault Portfolio

Multiple — NC, AZ, VA, IN, TX, MO, CA
#
Follow Us:

PCA

  • About
  • Services
  • Representative Projects
  • News & Events
  • Resources

Careers

  • Work at PCA
  • Life at PCA
  • Open Positions

Contact Us

  • Request A Quote
  • Client login
  • dphillips@pcallc.com
  • (626) 685 - 9560

Copyright Property Condition Assessments LLC 2026

Call Request a Quote