call-header call Today : 626-685-9560
search icon cross icon
  • user icon Client Login
  • Request a quote

Property Condition Assessments: The Name That Has Set The Standard For over 27 Years.

  • About
    • Company Profile
    • Our Team
    • FAQ
  • Services
    • Property Condition Assessments
    • Construction Consulting
    • Environmental Consulting
    • Energy Consulting
    • Government & Institutional
    • Specialty Consulting
  • Representative Projects
  • News & Events
  • Resources
  • Careers
  • Contact US

Our Projects

banner angle long down arrow

James Center

location1

Location

6901 South 19th Street, Tacoma, WA
location2

Total Buildings

9

Total Sqft:

140,240

Property Details:

  • Building Type: Retail
  • Building Address: 6901 South 19th Street
  • Land Area: 15.95 acres
  • Building Area: 140,240 sf
  • Number of Buildings: 9
  • Stories: 1
  • Year Built: 2000
  • Surface Parking: 778 spaces

Services Completed:

  • Architectural Assessment
  • Mechanical/Electrical/Plumbing/Limited Fire- & Life-Safety Assessment
  • 100% Inventory of ADA Compliance for Tenant Restrooms
  • Structural -Seismic Assessment
  • Roofing Assessment
  • 100% Interior Tenant Walk Through
  • Inventory of Electrical Panels and HVAC units for each tenant

About This Project

PCA conducted a Property Condition Assessment of James Center, a retail property located at 6901 South 19th Street in Tacoma, Washington. The property comprises nine single-story buildings totaling approximately 140,240 square feet on a 15.95-acre site, with 778 surface parking spaces. The buildings were completed in 2000.

The engagement included architectural, structural-seismic, roofing, and mechanical/electrical/plumbing/limited fire- and life-safety assessments under ASTM E2018 protocols. PCA’s team performed a 100% interior walk-through of tenant spaces and inventoried electrical panels and HVAC units serving each tenant, producing tenant-level equipment data to support the client’s capital planning. PCA also completed a 100% inventory of ADA compliance for tenant restrooms, documenting accessibility status to inform tenant-improvement and remediation planning. The structural-seismic evaluation informed site and structural risk evaluation for the multi-building configuration. Findings quantified deferred maintenance and remaining-useful-life projections across the nine buildings, giving the client a consolidated basis for prioritizing immediate repairs and sizing reserves for the principal building systems.

View Related Projects

Jamie Lane Residential Portfolio

East Palo Alto, CA

Euclid, Circle and Woodland Portfolio

East Palo Alto, CA

Georgia Medical Office Building Portfolio

Multiple — Lawrenceville and Newnan, GA

Harper Portfolio

Multiple — Avon, Hamlin, Lima, Rochester, NY

Palo Alto Residential Portfolio

East Palo Alto, CA

Project Vault Portfolio

Multiple — NC, AZ, VA, IN, TX, MO, CA
#
Follow Us:

PCA

  • About
  • Services
  • Representative Projects
  • News & Events
  • Resources

Careers

  • Work at PCA
  • Life at PCA
  • Open Positions

Contact Us

  • Request A Quote
  • Client login
  • dphillips@pcallc.com
  • (626) 685 - 9560

Copyright Property Condition Assessments LLC 2026

Call Request a Quote