call-header call Today : 626-685-9560
search icon cross icon
  • user icon Client Login
  • Request a quote

Property Condition Assessments: The Name That Has Set The Standard For over 27 Years.

  • About
    • Company Profile
    • Our Team
    • FAQ
  • Services
    • Property Condition Assessments
    • Construction Consulting
    • Environmental Consulting
    • Energy Consulting
    • Government & Institutional
    • Specialty Consulting
  • Representative Projects
  • News & Events
  • Resources
  • Careers
  • Contact US

Our Projects

banner angle long down arrow

Bell Federal Building

location1

Location

79 West Monroe, Chicago, IL
location2

Total Buildings

1

Total Sqft:

173,397

  • Building Type: Retail
  • Building Address: 8410-8750 Genesee Avenue
  • Land Area: 12.23 acres
  • Building Area: 178,623 sf
  • Number of Buildings: 12
  • Stories: 3
  • Year Built: 1988 and 1989
  • Surface Parking: 792 spaces

Services Completed:

  • Architectural Assessment
  • Mechanical/Electrical/Plumbing/Limited Fire- & Life-Safety Assessment
  • Roofing Assessment
  • Structural Assessment
  • Vertical Transportation Assessment
  • Public Records Review
  • Phase I Environmental Assessment
  • Asbestos-Containing Material Assessment

About This Project

PCA conducted a Property Condition Assessment of the Bell Federal Building at 79 West Monroe Street in Chicago, Illinois. The 14-story high-rise office property totals approximately 173,397 square feet on a 0.41-acre site, originally constructed in 1904 with a 1922 addition. PCA’s scope addressed the major building systems, envelope components, and environmental conditions relevant to the engagement.

The engagement included architectural, structural, roofing, and mechanical/electrical/plumbing/limited fire- and life-safety evaluations under ASTM E2018 protocols, along with a vertical transportation assessment, a public records review, a Phase I Environmental Site Assessment under ASTM E1527, and an asbestos-containing material survey. PCA documented observed conditions and quantified deferred maintenance and remaining-useful-life projections for the client’s reserve and capital planning. The vertical transportation assessment produced a reserve estimate for elevator replacement timing, while the asbestos survey supported abatement scope and budget estimation — relevant considerations given the building’s early-twentieth-century construction. The Phase I screened for recognized environmental conditions to inform the client’s environmental risk position. The consolidated findings gave the client a defensible basis for prioritizing immediate repairs, sizing reserves, and evaluating environmental and hazardous-materials exposure across the property.

View Related Projects

Jamie Lane Residential Portfolio

East Palo Alto, CA

Euclid, Circle and Woodland Portfolio

East Palo Alto, CA

Georgia Medical Office Building Portfolio

Multiple — Lawrenceville and Newnan, GA

Harper Portfolio

Multiple — Avon, Hamlin, Lima, Rochester, NY

Palo Alto Residential Portfolio

East Palo Alto, CA

Project Vault Portfolio

Multiple — NC, AZ, VA, IN, TX, MO, CA
#
Follow Us:

PCA

  • About
  • Services
  • Representative Projects
  • News & Events
  • Resources

Careers

  • Work at PCA
  • Life at PCA
  • Open Positions

Contact Us

  • Request A Quote
  • Client login
  • dphillips@pcallc.com
  • (626) 685 - 9560

Copyright Property Condition Assessments LLC 2026

Call Request a Quote