call-header call Today : 626-685-9560
search icon cross icon
  • user icon Client Login
  • Request a quote

Property Condition Assessments: The Name That Has Set The Standard For over 27 Years.

  • About
    • Company Profile
    • Our Team
    • FAQ
  • Services
    • Property Condition Assessments
    • Construction Consulting
    • Environmental Consulting
    • Energy Consulting
    • Government & Institutional
    • Specialty Consulting
  • Representative Projects
  • News & Events
  • Resources
  • Careers
  • Contact US

Our Projects

banner angle long down arrow
Los Angeles Center Studios office tower exterior

Los Angeles Center Studios

location1

Location

401 Boylston Street, Los Angeles, CA 90017
location2

Total Buildings

9

Total Sqft:

261,850

Property Details:

  • Building Address: 401 Boylston Street, Los Angeles, CA 90017
  • Land Area: 3.99 acres
  • Building Area: 142,120 sf
  • Number of Buildings: 2

Services Completed:

  • Architectural Assessment
  • Curtain Wall Assessment
  • Mechanical/Electrical/Plumbing/Limited Fire-Life Safety Assessment
  • Planning, Zoning, and Resource (PZR) Report
  • Roofing Assessment
  • Structural Seismic Assessment
  • Vertical Transportation Assessment

About This Project

PCA performed a property condition assessment of Los Angeles Center Studios, a seven-building movie and television studio complex situated on approximately 4.80 acres at 460 South Bixel Street, 461 South Boylston Street, 1201 West 5th Street, and 461 Beaudry Drive in Los Angeles, California. The campus totals approximately 452,747 square feet across the seven structures. PCA’s scope addressed the major building systems, envelope components, and site documentation relevant to the engagement.

The engagement included architectural, curtain wall, mechanical/electrical/plumbing/limited fire-life-safety, roofing, structural seismic, and vertical transportation assessments, along with a Planning, Zoning, and Resource (PZR) report. PCA’s curtain wall evaluation informed envelope-replacement timing and immediate repair priorities, while the structural seismic assessment supported site and structural risk evaluation across the seven-building campus. The vertical transportation assessment produced a reserve estimate for elevator replacement timing, and the PZR review supplemented field findings with documentation context. Consolidated findings gave the client a defensible basis for prioritizing immediate repairs and sizing reserves across the campus’s principal systems.

View Related Projects

Jamie Lane Residential Portfolio

East Palo Alto, CA

Euclid, Circle and Woodland Portfolio

East Palo Alto, CA

Georgia Medical Office Building Portfolio

Multiple — Lawrenceville and Newnan, GA

Harper Portfolio

Multiple — Avon, Hamlin, Lima, Rochester, NY

Palo Alto Residential Portfolio

East Palo Alto, CA

Project Vault Portfolio

Multiple — NC, AZ, VA, IN, TX, MO, CA
#
Follow Us:

PCA

  • About
  • Services
  • Representative Projects
  • News & Events
  • Resources

Careers

  • Work at PCA
  • Life at PCA
  • Open Positions

Contact Us

  • Request A Quote
  • Client login
  • dphillips@pcallc.com
  • (626) 685 - 9560

Copyright Property Condition Assessments LLC 2026

Call Request a Quote